District-wise Number of Sub-Station in Manipur, 2017-18 to 2019-20:

District2017-20182018-20192019-2020
132/33KV33/11 KV132/33KV33/11 KV132/33KV33/11 KV
Senapati212212212
Tamenglong181818
Churachandpur110310312
Chandel282828
Ukhrul19110110
Imphal East212212214
Imphal West212212213
Bishnupur151515
Thoubal3838310
Manipur158417851792

Source: Economic Survey Manipur 2020-21

 

Net Energy Available in Manipur, 2015-16 to 2019-20:

YearPower (Lakh KWH)
PurchasedFree Energy from Loktak Hydro Electric ProjectTotal Available
2015-168859.50618.109477.60
2016-179853.50858.4010711.90
2017-189591.95971.6210563.57
2018-199985.12694.6710679.79
2019-209205.15419.729624.87

Source: Economic Survey Manipur 2020-21

 

Project Power Requirement of Manipur according to draft 19th Electric Power Survey Forecast, 2020-21 to 2022-23:

YearPeak Load (MW)Energy Requirement (MU)
2020-213721925
2021-224102103
2022-234532300

Source: Economic Survey Manipur 2020-21

 

Demand and Supply of Power of Manipur, 2014-15 to 2019-20:

YearPeak Load Met (MW)Energy Requirement Met (MU)
2014-15158735
2015-16170834
2016-17170761
2017-18195830
2018-19215895
2019-20217.26*910

* As on 17th January, 2020

Source: Economic Survey Manipur 2020-21

 

Share of Power for Manipur from Central Sector, 2019-20:

Sl. No.Name of the ProjectInstalled Capacity (MW)Allocation from (MW)
Firm ShareUnallocated Share
1Loktak HPS105 (90)396.1
2Khandong HPS50(43)30.6
3Kopili +Kopili Ext. HPS200(170)122.4
4Kopili HEP Stage-II25(21)10.3
5Kathalguri GPS291(247)203.6
6Agartala GTP-CC130(111)91.5
7Bongaigaon Thermal PP750(638)319
8Doyang HPS75(64)50.9
9Ranganadi HPS405(345)294.8
10Pallatana GPP726(628)42-
11Pare HEP110 (94)81.3

Source: Economic Survey Manipur 2020-21

 

Achievement of Deen Dayal Upadhaya Gram Jyoti Yojana:

DistrictScopeAchievement as on 30.03.202
Census VillageHabitationCensus VillageHabitation
Bishnupur125125
Chandel61176117
Churachandpur97459745
Tamenglong13271327
Senapati26612661
Ukhrul14811481
Total212256212256

Source: Economic Survey Manipur 2020-21

 

District-wise Electric Consumption of Power, 2016-17:

(MU)

DistrictDomesticCommercialIndustrialPublic LightingIrrigation & AgriculturePublic Water WorkBulk SupplyTotal
Senapati25.912.722.30.3200.068.5739.88
Tamenglong1.790.230.020.01001.693.74
Churachandpur12.151.820.180002.1216.27
Chandel7.40.960.010.3900.071.19.93
Ukhrul4.440.350.010.02002.16.92
Imphal East73.5511.2512.670.530.029.7225.13132.87
Imphal West105.0322.743.890.820.038.5636.23177.3
Bishnupur28.912.461.271.290.72.053.0639.74
Thoubal38.991.151.340.060.23.058.2353.02
Manipur298.1743.6821.693.440.9523.5188.21479.65

Source: Economic Survey Manipur 2020-21

 

Number of Consumers by Categories in Manipur, 2019-20:

Sl. No.CategoryNumber of Consumer
1Domestic473161
2Commercial23787
3Public Lighting462
4Public Water Supply-LT35
5Irrigation and Agricultural-LT47
6Small Industry-LT2367
7Commercial-HT694
8Public Water Supply-HT174
9Irrigation and Agricultural-HT27
10Medium Industry-HT80
11Large Industry-HT38
12Bulk Supply-HT388

Source: Economic Survey Manipur 2020-21

 

Power Scenario of Manipur, 1993-94 to 2016-17:

YearInstalled Capacity (kw)Electricity Generated (lakh kwh)Energy Purchased (lakh kwh)Electricity Consumed (mill. kwh)Inhabited Villages according to CensusNumber of Villages ElectrifiedPercentage of Electrified Villages to Total Villages
1993-19941242232.682,763.51216.5102,1821,52569.89
1994-19951262229.672,712.76213.7382,1821,59072.87
1995-19961237121.662,550.26247.3152,1821,74880.11
1996-19971237110.713,037.99286.3772,1821,88886.56
1997-1998126226.803,463.14322.1802,1821,94088.91
1998-1999118457.573,756.68179.8892,1821,99091.20
1999-2000118458.293,926.73173.0662,1822,00191.70
2000-2001118454.293,556.24176.9362,1822,00191.70
2001-2002118456.673,798.26167.5622,3202,00186.25
2002-20034725235.774,271.84165.6452,3202,00786.51
2003-20044705242.804,313.49165.3832,3201,89981.85
2004-20054725214.3255,712.60141.2542,3201,90382.03
2005-2006472523.1405,209.86299.8152,3201,93083.19
2006-20074725231.0534,412.16221.8822,3201,94283.71
2007-2008462126.024,252.31334.9642,3201,96684.74
2008-2009448206.466,159.38301.6022,3201,98685.60
2009-20104542020.1054651.21290.3692,320200279.32
2010-20114502019.3015672.18-2515207186.29
2011-20124502016.1505633.70-2515225882.35
2012-20133660012.4005783.44-2515-89.78
2013-2014366008.4406064.02-2515--
2014-2015294906.5256525.80442.272515213484.85
2015-201622110-7654.90.*474.862515--

*: An on 31st January 2016 (MSPDCL)

Source: Economic Survey Manipur 2015-16 and 2016-17

 

Electricity generated and consumed in Manipur, 2009-10 to 2015-16:

(Million KWH)

Sl. No.ItemUnit2009-102010-112011-122012-132013-142014-152015-16
1.Installed CapacityMW45.42045.02045.02036.60036.6002.9492.211
2.Electricity GeneratedMillion Kwh2.01051.93011.6150.1240.0840.6525*366.600
3.Energy PurchasedMillion Kwh-567.218---644.990885.95*
4.Electricity Consumed:        
a)DomesticMillion Kwh127.485----256.65*298.85*
b)Commercial light & small power16.009----35.83*39.84*
c)Industrial8.796----29.12*23.81*
d)Street lighting4.230----4.43*4.13*
e)Irrigation & Agriculture0.750----2.41*1.78*
f)Public water work & Sewage pumping18.201----16.99*16.69*
g)Bulk supply44.604----96.84*89.75*
h)Temporary supply-------
5.Free energy from NHPCLakh Kwh-709.090610.490--42.420618.100
6.Villages ElectrifiedNumber200220712258--21342220

*: MU (Mega Unit)

Source: Statistical Handbook Manipur 2017

 

Consumption of Electricity by Users in Manipur

(Million KWH)

Sl. No.Item2008-092009-102010-112011-122014-152015-16
1.Small power, Light & Fans      
(a)Domestic120.116127.485--256.65298.85
(b)Commercial14.21916.009--35.8339.84
2.Industrial----29.1223.81
(a)Low Medium Volt86758.796----
(b)High Medium Volt------
3.Public Lighting3.1994.23----
4.Agriculture & Irrigation0.1210.75--4.434.13
5.Public Water work & Sewage Pumping9.63618.201--2.411.78
6.Bulk Supply40.74844.604--16.9916.69
7.Temporary0.491---96.8489.75
 Total Consumption197.205220.075271.097324.760442.27474.85

Source: Statistical Handbook Manipur 2017

 

District wise No. of Sub-Station in Manipur during 2012-13 to 2015-16:

DistrictsNo. of Sub-Station
2012-20132013-20142014-20152015-2016
132/33 KV33/11 KV132/33 KV33/11 KV132/ 33 KV33/11 KV132/ 33 KV33/11 KV
Senapati282858210
Tamenglong16162617
Churachandpur15163617
Chandel02021214
Ukhrul06061617
Imphal East2727510210
Imphal West110110310211
Bishnupur15152515
Thoubal14142517
Manipur95395424581268

Source: Economic Survey Manipur 2015-16 and 2016-17

 

The erstwhile Electricity Department, Manipur was unbundled and corporatized into the following two State Owned functionally independent successor entities w.e.f. 1st February, 2014, in pursuance of Electricity Act, 2003:

 

(i) Manipur State Power Company Limited (MSPCL)

(ii) Manipur State Power Distribution Company Limited (MSPDCL)

 

The functions of the two entities are depicted in Following table:

EntityActivities
1. MSPCL(a) Transmission network of 33 KV and above
(b) All Sub-station of 33/11 KV and above
(c) All generation units other than those mentioned in MSPDCL
(d) State Level Load Dispatch Centre (SLDC) is currently with MSPCL. An independent society called Manipur State Level Load Dispatch Society is being formed to take up the work of SLDC.
2. MSPDCL(a) Transmission network of 11 KV and below
(b) All other distribution activities
(c) Generation assets at 36 MW Heavy Fuel at Leimakhong, Hydel Plant at Leimakhong, existing DG Sets
(d) Revenue collection activities

Source: Economic Survey Manipur 2016-17

 

Demand and Supply of Power in Manipur, 2003-04 to 2015-16:

YearPower (MW)
DemandPart of the Demand MetShortfall
2003-200418910683
2004-20051161088
2005-200614011525
2006-200715511045
2007-200814511035
2008-200915710057
2009-201017011060
2010-201118411074
2011-201217111556
2012-201320111982
2013-201422913099
2014-201526223230
2015-2016301167.19133.81

Source: Economic Survey Manipur 2015-16 and 2016-17

 

District-wise Electricity Consumption of Power, 2014-15 and 2015-16:

DistrictsDomesticCommercialIndustrialPublic LightingIrrigation & AgriculturePublic Water WorkTotal
2015-2016
Senapati26.624.634.570.330.000.1336.28
Tamenglong2.080.140.040.030.000.032.32
Churachandpur44.841.510.320.060.000.0046.73
Chandel8.732.2200.390.000.0711.41
Ukhrul4.290.380.060.040.000.004.77
Imphal East70.696.0712.990.480.139.0899.44
Imphal West83.8521.473.460.950.001.96111.69
Bishnupur25.652.270.941.791.222.0333.90
Thoubal32.101.161.440.060.433.4038.59
Manipur298.8539.8423.814.131.7816.70385.13
2014-2015
Senapati23.003.717.160.320.0011.9946.18
Tamenglong2.130.180.020.020.000.332.68
Churachandpur34.391.210.340.060.008.4744.47
Chandel3.230.990.0040.370.007.0911.68
Ukhrul2.980.310.050.040.001.865.24
Imphal East63.525.7413.250.470.1332.11115.22
Imphal West80.0021.326.021.400.0037.69146.43
Bishnupur20.741.440.8010651.743.4329.80
Thoubal26.660.931.480.100.5410.8640.57
Manipur256.6535.8329.124.432.41113.83442.27

Source: Statistical Yearbook of Manipur 2015

Economic Survey Manipur 2016-17

 

Requirement of Power & Energy in Manipur during 2010-11 to 2015-16:

YearPeak load (MW)Energy requirement (MU)
2010-2011184838
2011-2012171615
2012-2013201722
2013-2014229824
2014-2015262956
2015-20163011080

Source: Economic Survey Manipur 2015-16 and 2016-17

 

Power availability in respect of Manipur, 2007-08 to 2015-16:

YearPower (Lakh KWH)
RequirementGeneratedPurchasedFree Energy from Loktak Hydro Electric ProjectTotal Available (Col. 3 to Col. 5)Short-fallPer Capita Availability*
2007-20086,41017.305720.30707.706,445.3035.3246.06
2008-20097,0206.465504.25587.696,098.40921.60228.41
2009-20107,66020.114651.21447.865,119.182,540.82188.15
2010-20118,38020.115672.18709.096401.381978.62230.93
2011-2012615015.645633.70610.496259.83109.83216.77
2012-2013722010.085783.44669.046462.56757.44218.62
2013-2014824010.106064.02736.866810.981429.02225.45
2014-2015942010.106425.80424.206860.102699.90222.21
2015-201610800Nil7654.90*579.308234.20--

*Per Capita Availability is calculated by using Estimated Population

Source: Economic Survey Manipur 2015-16 and 2016-17

 

Share of power for Manipur from Central Sector, 2015-16:

Name of the ProjectInstalled Capacity MWShare of Manipur (As on 30 Aug. 2015)
PercentMW
Loktak Hydro Electric Project (NHPC)10536.57384**
Khangdong HPS505.333
Kopilli + Kapilli HPS2006.1712
Kopilli HEP Stage II256.02
Kathalguri GPS2516.923
Agartala GPS847.06
Agartala GPS Extra Unit I236.851.6
Doyang HPS756.75
Ranganadi HPS4057.1629
Pallatana GPP7265.7942
Total198494.47162.00

**- Inclusive of allocation of surrendered share 8 MW by Meghalaya to Manipur

Source: Economic Survey Manipur 2016-17

 