Power and Energy in Assam

Figure at a Glance in Assam, 2022-23:

Installed Capacity of Generating Plant (MW)425.66
Gross Unit Generation (MU)2213.43
Energy Requirement (MU)11460.00
Peak Demand (MW)2426.00
Peak Demand Met (MW)2357.00
Shortage (in %)2.84
No. of Consumers
Domestic6235032
Commercial345375

Source: Statistical Handbook Assam 2023

 

Installed Capacity and Generation of Electricity in Assam, 2020-21 to 2022-23:

Type/ Name of Plant2020-212021-222022-23
A. Installed Capacity of Generating Plant (MW)
HydelKLHEP Myntriang SHEP100100100
Stage-I699
Stage-II4.54.54.5
GasLTPS606060
LRPP69.7569.7669.76
NTPS424234.47
NRPP-62.2562.25
Waster HeatLTPS WHRU37.237.237.2
Recovery UnitNTPS WHRU22.522.512.33
NRPP WHRU-36.1536.15
Total (A)APGCL341.96422.36425.66
B. Gross Unit Generation (MU)
HydelKLHEP Myntriang SHEP202.62407.25475.78
Stage-I19.2918.2734.34
Stage-II11.9614.8322.31
GasLTPS447.57406.52540.52
LRPP477.07510.11505.41
NTPS231.08157.1192.86
NRPP0490.56442.23
Total (B)APGCL1389.592004.652213.43
C. Auxiliary Consumption (MU)
HydelKLHEP Myntriang SHEP0.572.042.38
Stage-I0.190.180.34
Stage-II0.120.150.22
GasLTPS36.9638.3141.7
LRPP9.6711.328.01
NTPS12.358.9410.96
NRPP022.2914.82
Total (C)APGCL59.8683.2378.44
D. Net Unit Generation (MU)
HydelKLHEP Myntriang SHEP202.06405.22473.4
Stage-I19.0918.0933.99
Stage-II11.8414.6822.09
GasLTPS410.61368.21498.82
LRPP467.41498.79497.4
NTPS218.73148.16181.9
NRPP0468.27427.41
Total (D)APGCL1329.741921.422134.99

Source: Statistical Handbook Assam 2023

 

Requirement and shortage of Electricity in Assam, 2020-21 to 2022-23:

Item2020-212021-222022-23
Energy Requirement (MU)10192108441146
Energy Availability (MU)98151082511459
Shortage (MU)377191
Peak Demand (MW)205121652426
Peak Demand Met (MW)199021202357
Shortage (MW)614569
Shortage (In %)2.972.082.84

Source: Statistical Handbook Assam 2023

 

Transmission, Distribution and Commercial Losses in Assam, 2020-21 to 2022-23:

Item2020-212021-222022-23
Energy Input (MUs) (At APDCL end)9156.110259.410984.0
Energy Billed (MUs)7457.88520.19202.5
T & D Losses (MUs) (in %)18.5516.9516.22
Amount Billed (Rs. in Crore)5283.656017.487300.86
Amount Realised (Rs. in Crore4990.986303.827343.86
Collection Efficiency (in %)94.46104.76100.59
Aggregate Transmission and Commercial Losses (%)23.0613.0015.73

Source: Statistical Handbook, Assam-2023.

 

Electricity Purchased in Assam, 2020-21 to 2022-23:

YearMU Purchased/generated (ex-bus)All Charges Total (Rs. in Crore)Average Rate (Rs/kwh)
2020-2111003.645807.245.28
2021-2211952.005917.004.95
2022-2312813.048478.856.62

Source: Statistical Handbook Assam 2023

 

Sector-Wise Electricity Consumption in Assam, 2021-21 to 2022-23: (Units in MU)

SectorPeriod% Change in 2022-23 over 2021-22
2020-212021-222022-23
Industrial1011.561232.001508.8049.16%
Agriculture37.2748.0054.4045.96%
Domestic4224.864718.004566.808.09%
Commercial987.221152.001367.6038.53%
Public Service99.72119.00167.4067.87%
Other1097.201251.001471.2034.09%

Source: Statistical Handbook Assam 2023

 

Circle-Wise number of Consumers in Assam, 2020-21 to 2022-23:

Name of Circle2020-212021-222022-23
 DomesticCommercialDomesticCommercialDomesticCommercial
Badarpur311630155033307651712033220318976
Barpeta458445187394560792027047303222082
Bongaigaon485445179805105362057150799522415
Cachar276511184683040742067732544722174
Dibrugarh196233117331795794491921920311926
GEC-I228569341072423803295724710736692
GEC-II297382141783050851646631751517808
Golaghat208477782221313184482144099361
Jorhat252173121862706341327926458214328
Kokrajhar413834155474443481674745805819641
Kanch210394887022748292312289429948
Mangaldoi338480131293319451461133759715954
Morigaon179333764718607984681882069640
Nagaon494756257635091572768451812630162
North Lakhimpur358549134563600531461836782116064
Rangia31538212343320252137545415038
Sivasagar25700414060273368150377816068
Tezpur352918169203639271769936926219346
Tinsukia270373164492709001704326638717752
Total590588829490060997743495996235032345375

N.B.: Domestic consumer including Jeevan Dhara, Domestic-A, Domestic-B and HT Domestic

Source: Statistical Handbook Assam 2023

 

Source-wise Electricity in Assam Generated by APGCL, 2020-21 to 2022-23:

Type of Power PointElectricity Generated (MU)% Change in 2022-23 over 2021-22
2020-212021-222022-23
Thermal Power Plant (Natural Gas Based)1155.731564.291681.017.46
Hydro Power Plant233.87440.35532.4220.91

Source: Statistical Handbook Assam 2023

 

Voltage Level-Wise Existing Transmission Lines, 2019-20 to 2022-23:

Name of Transmission LinesVoltage Level in Ckt. Km
2019-202020-212021-222022-23
Total 400 KV Transmission Lines7.207.207.206.50
Total 220 KV Transmission Lines2048.002048.052048.051917.21
Total 132 KV Transmission Lines3039.003069.193115.003496.59
Total 66 KV Transmission Lines613.00613.00613.00559.30
Total5707.205737.445783.255979.60

Source: Statistical Handbook Assam 2023

 

Renewable Energy Related District-Wise Physical Performance of Agriculture Department in Assam, 2021-22 to 2022-23:

DistrictInstallation of Solar PV Pump-set (in Nos.)
2021-222022-23
DuringFunctioningDuringFunctioning
Kokrajhar1919248248
Dhubri00191191
Goalpara00525525
Barpeta66385385
Morigaon22790790
Nagaon00318318
Sonitpur004343
Lakhimpur00121121
Dhemaji00152152
Tinsukia0088
Dibrugarh0066
Sivasagar003131
Jorhat0066
Golaghat005252
Karbi Anglong002424
Dima Hasao0000
Cachar0000
Karimganj0000
Hailakandi0000
Bongaigaon00263263
Chirang55214214
Kamrup008484
Kamrup Metro0033
Nalbari009494
Baksa00188188
Darrang009999
Udalguri00222222
Biswanath00176176
Charaideo0099
Hojai5656509509
Majuli0000
South Salmara00144144
West Karbi Anglong0000
Assam888849054905

Source: Statistical Handbook Assam 2023

 

Renewable Energy Related District-Wise Physical Performance of Irrigation Department in Assam, 2021-22 to 2022-23:

DistrictInstallation of Solar PV Pump-set (in Nos.)
2021-222022-23
DuringFunctioningDuringFunctioning
Kokrajhar46145-214
Dhubri2848-84
Goalpara2555-53
Barpeta1051802239
Morigaon2-102385
Nagaon62326395
Sonitpur149379-713
Lakhimpur0-129507
Dhemaji0-77293
Tinsukia0-175607
Dibrugarh101564298
Sivasagar85130-231
Jorhat01484284
Golaghat39960181
Karbi Anglong0-114381
Dima Hasao0-00
Cachar0-247682
Karimganj0-145340
Hailakandi0-69222
Bongaigaon8283-143
Chirang3535-61
Kamrup11433532537
Kamrup Metro2472082
Nalbari0-157527
Baksa0-2111
Darrang3750147
Udalguri0--0
Charaideo9494-190
Majuli666618158
South Salmara4848054
West Karbi Anglong0-00
Assam961237713228119

Source: Statistical Handbook Assam 2023

 

Status of Electrification under DDUGJY-New Scheme : (FY 2021-22 to 2022-23)

ParticularsRevised TargetYearly AchievementsCumulative Achievement% Achievement
Year : 2021-22
Households (Nos.)368610368610368610100%
11 KV Line (Km)3540.3153540.3153540.315100%
LT Line (Km)11676.91011676.91311676.913100%
Distribution Transformer (DTR) (Nos.)565356535653100%

N.B.: DDUGJY-New (Add. HH) Scheme is closed on 07-03-2022

Source: Statistical Handbook Assam 2023

 

Financial Status under DDUGJY-RE(XII Plan), DDUGJY, SAUBHAGYA and DDUGJY-New(Addl. HH) Scheme, 2020-21 to 2022-23: (Rs. in Crore)

Name of Scheme2020-212021-222022-23
ReceivedExpenditureReceivedExpenditureReceivedExpenditure
DDUGJY-RE (XII Plan)115.48131.6794.5116.572.7571.06
DDUGJY2.75158.5390.76111.5018.11122.62
Saubhagya/ Addl. Infra476.92431.30157.89233.72068.97
DDUGJY-New (Addl. HH)----164.48137.12
Total595.15721.5343.15461.79185.34399.77

Source: Statistical Handbook Assam 2023

 

Renewable Energy Physical Performance of APDCL during 2022-23:

DistrictSmart Street Lighting @Rooftop Solar PV Station #Integrated Power Development Scheme (IPDS) GoI
No. of Rural PHCsPlant Capacity (KW)
Kokrajhar952517
Dhubri114200
Goalpara144200
Barpeta2752565
Morigaon44200
Nagaon1673537
Sonitpur185250
Lakhimpur102100
Dhemaji102100
Tinsukia3121060
Dibrugarh2131540
Sivasagar165250
Jorhat2242063
Golaghat2042017
Karbi Anglong042040
Dima Hasao0150
Cachar73150
Karimganj63150
Hailakandi2150
Bongaigaon82100
Chirang12100
Kamrup2373520
Kamrup Metro27315216
Nalbari194200
Baksa33150
Darrang1631529
Udalguri22100
Biswanath2000
Charaideo5000
Hojai22000
Majuli0000
South Salmara0000
West Karbi Anglong0000
Bajali0000
Assam37294470604

N.B.: The Renewable Project developed by Private Parties & other agencies are not included

@- Smart Street Lighting in identified Urban Areas, Annual Plan 2019-20, Govt. of Assam.

#- Rooftop Solar PV Station on Govt. building and off grid solar plant at primary health centre

(PHC) located in off grid remote villages.

Source: Statistical Handbook Assam 2023

 

District-wise 8MW Grid-Connected Rooftop SPV Plants in Assam during 2020-21:

DistrictTotal Nos.Capacity in kW
Kamrup Metro1951210.91
Kamrup27.26
Dibrugarh111
Tinsukia428.59
Sivasagar1154
Jorhat26120.71
Nagaon433
Golaghat16
Biswanath Chariali13
Lakhimpur13
Baksa16.51
Barpeta48.05
Nalbari312.87
Dhubri18
Goalpara12
Bongaigaon215
Total2581529.9

Source: Statistical Handbook Assam 2021

 

District-wise Solar Street Light Projects under AEDA, 2019-20 and 2020-21: (In Nos)

District2019-202020-21Total
Baksa130480610
Barpeta01010
Biswanath0770770
Bongaigaon015001500
Cachar20020
Dhemaji000
Dibrugarh0360360
Dima Hasao000
Goalpara01010
Golaghat07070
Jorhat30690720
Kamrup Metro0130130
Kamrup09090
Karbi Anglong02020
Karimganj1000100
Lakhimpur020002000
Nagaon0100100
Nalbari02020
Sivasagar40012151615
Sonitpur4011171157
Tinsukia0100100
Udalguri000
Total72086829402

AEDA: Assam Energy Development Agency

Source: Statistical Handbook Assam 2021

 

District-wise Number of Villages Electrified in Assam, 2016-17 and 2017-18:

DistrictNo. of villages (Census 2011)No. of villages Electrified (Cumulative)
2016-20172017-2018
Kokrajhar106810631067
Dhubri109110331087
Goalpara829795826
Barpeta835830833
Morigaon632630631
Nagaon141214031403
Sonitpur187618571865
Lakhimpur118411441166
Dhemaji131912511303
Tinsukia116811541168
Dibrugarh134813451346
Sivasagar875871871
Jorhat848812839
Golaghat112511241124
Karbi-Anglong292127352885
Dima Hasao695537687
Cachar104010061036
Karimganj936932934
Hailakandi331327329
Bongaigaon563561563
Chirang508507507
Kamrup106810491064
Kamrup (M)216214214
Nalbari456452456
Baksa690690690
Darrang561541541
Udalguri800800800
Assam263952566326235

Source: Statistical Handbook of Assam 2018

 

Sale of Electricity by Type of Consumption in Assam, 2014-15 and 2016-17:

CategoryRangeEnergy Billed (MU)
2014-20152015-20162016-2017
LT Category
Jeevan Dhara 606771487
Domestic AAbove 0.5 Kw to 5 Kw153520752639
Domestic BAbove 5 Kw to 20 Kw202228261
Commercial LoadAbove 0.5 Kw to 20 Kw517578631
General LoadUp to 20Kw130118117
Public Lighting-141717
AgricultureUp to 7.5 hp101215
Small Industries (Rural) up to 20KwUp to 20 Kw505764
Small Industries (Urban)-283133
Temporary Supply---7
LT Total-309238874271
HT Category
Domestic25 Kw and above394336
Commercial25 Kw and above277324375
Public Water Works-786687
Bulk Supply (Govt. Education Inst.)-717886
Bulk Supply (Others)-377384391
HT Small IndustriesUpto 50 Kw232226
HT Industries-I50 Kw to 150 Kw767878
HT Industries-IIAbove 150 Kw913907617
Tea, Coffee and Rubber-400412426
Oil & Coal-109129112
HT Irrigation LoadAbove 7.5 hp282221
HT Total-239124652255
All Total-548363526526

Source: Statistical Hand Book Assam 2016 and 2017