District-wise Cumulative Achievement of Energy Development Agency in Arunachal Pradesh, 2022-23:

District

Micro Hydel Project

Solar Photovoltaic Programme

No.

Capacity (In Kw)

Solar Lantern

Solar Home system

Solar Street Light

S.P.V. Power Plant (Off Gird)

S.P.V. Power Fencing

No.

No.

No.

Capacity in kWp

Km.

123456789
Tawang15455.006677982119910115-
West Kameng6490.00113166391366755-
East Kameng15305.00947157041907632.8-
Pakke Kessang--61222965322105-
Papum Pare4110.0028370158244001012036.00
Kra Daadi2125.00633017876321164-
Kurung Kumey11355.0071181284692325-
Lower Subansiri--60139191338110-
Kamle260.006165314522---
Upper Subansiri13410.001548119391093425-
West Siang19510.00805717081000569.5-
Shi Yomi10245.001361625500210-
Lepa Rada--3081425376110-
Siang125.002993425422120-
Lower Siang--4196198337110-
East Siang--197839961426535-
Upper Siang572.50171188671065450-
L/Dibang Valley--9095141314678434.7-
Dibang Valley675.00215610656767130-
Namsai--130503431050240-
Lohit--70016611173220-
Anjaw6110.00413089774615-
Changlang--1665817705606275-
Tirap--83084352183365-
Longding150.00272361371423240-
Total1163397.52472862741128085104180636

Contd.

District

SOLAR PHOTOVOLTAIC PROGRAMME

Solar Cooker

Solar Cold Storage

Solar Dryer

Solar Distillation Plant

Aditya Solar Shop

Energy Park

Solar Power TV

Village Elect. through  SHS

Grid Connected S.P.V. Power Plant

No.

No.

No.

No.

No.

No

No.

No.

No.

Capacity in kWp

1101112131415 161718
Tawang70-103--122--
West Kameng70 113--122--
East Kameng60 -3--1388--
Pakke Kessang18 --------
Papum Pare74 72611261213207.0
Kra Daadi20--1---106--
Kurung Kumey30--2---273--
Lower Subansiri50--21--87--
Kamle20--1--1---
Upper Subansiri80--3111237--
West Siang40--31-1138--
Shi Yomi30--1------
Lepa Rada10--1------
Siang12--1------
Lower Siang10--1------
East Siang801-21-115--
Upper Siang50-22--145--
L/Dibang Valley100--4111112--
Dibang Valley50--2---103--
Namsai70122------
Lohit70--312117--
Anjaw36-692---234--
Changlang---4--128--
Tirap50-22--111--
Longding20-32---18--
Total112021715675141917213207

Source: Statistical Abstract of Arunachal Pradesh 2023

 

District-wise Cumulative Achievement of Energy Development Agency in Arunachal Pradesh, 2020-21:

District

MICRO HYDEL PROJECT

SOLAR PHOTOVOLTAIC PROGRAMME

No

Capacity (In Kw)

Solar Lantern

Solar Home System

Solar Street Light

S.P.V. Power Plant

S.P.V. Power Fencing

No

No

No

No

Capacity in kWp

123456789
Tawang1545583791329910115-
West Kameng64901243467446755-
East Kameng153051623625480632.8-
Pakke kessang--330296222105-
Papum Pare4110177413849351012036
Kra Daadi21253304702321164-
Kurung Kumey11355765625292325-
Lower Subansiri--893575338110-
Kamle26016531422---
Upper Subansiri134101081701293425-
West Siang1951020571025579569.5-
Si-Yomi1024533062584210-
Lepa Rada--25042526110-
Siang12520042522120-
Lower Siang--16019837110-
East Siang--961853342535-
Upper Siang572.5796701449450-
L.D. Valley--5958355678434.7-
Dibang Valley67575695696630-
Namsai--45034322240-
Lohit--799625193220-
Anjaw61105306768215-
Changlang--668770606275-
Tirap--708375160365-
Longding150250137143240-
Total for A.P.1163397.518551153396221103166636

Contd.

District

SOLAR PHOTOVOLTAIC PROGRAMME

Solar Cooker

Solar Dryer

Solar Distillation Plant

Aditya Solar Shop

Energy Park

Solar Power TV

Village Elect. through SHS

Grid Connected S.P.V. Power Plant

Km

No

No

No

No

No

No

No

 

1101112131415161718
Tawang70103--122--
West Kameng70113--122--
East Kameng60-3--1388--
Pakke kessang18--------
Papum Pare7471611261213207
Kra Daadi20-1---106--
Kurung Kumey30-2---273--
Lower Subansiri50-21--87--
Kamle20-1--1---
Upper Subansiri80-3111237--
West Siang40-31-1138--
Si-Yomi30-1------
Lepa Rada10-1------
Siang12-1------
Lower Siang10-1------
East Siang80-21-115--
Upper Siang50-2--145--
L.D. Valley100-4111112--
Dibang Valley50-2---*103--
Namsai70-2------
Lohit70-312117--
Anjaw36692---234--
Changlang--4--128--
Tirap50-2--111--
Longding20-2---18--
Total for A.P.11201615675141917213207

Source: Statistical Abstract of Arunachal Pradesh 2021

 

District-wise Biogas Plants, Solar, Chulla, Water Mill and Biomass Assessment Study in Arunachal Pradesh, 2022-23:

District

Solar Thermal

Biomass Gasifier

Water Mill

National Biogas & Manure Management Progm.

Wind Energy

National Programme on Improved Chullas

Wind Solar Hybrid Power Plant

Solar Water Heating System

PV Water Pumping System

Water Purifier

Biomass Gasifier

Biomass Assessment Study

Family Type Biogas Plants

Night Soil based Biogas Plant

Assessment study of Wind Energy

Improved Chullah

High Altitude Chullahs

LPD

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

No.

Capacity in kWp

Tawang500---1-53-11325100--
West Kameng100---110190-3589699213.6
East Kameng100--12-1221-1540---
Pakke Kessang------5------
Papum Pare1700023121-7564-1625---
Kra Daadi-------------
Kurung Kumey------54--50---
Lower Subansiri300-----119--1739---
Kamle-------------
Upper Subansiri1100-2-2-80111860---
West Siang220013--2-395134233---
Shi Yomi500-----------60
Lepa Rada800------------
Siang700------------
Lower Siang500------------
East Siang100066-41-350--1665---
Upper Siang500--12-23--64520--
L/Dibang Valley20002----159--50---
Dibang Valley1000--11-8--162620--
Namsai90024----12------
Lohit1500--41-309--308026110
Anjaw500-----26--150---
Changlang1200---1-2431-1470---
Tirap4001--1-121-1540---
Longding200------------
Total33000129313161029169828494265383.6

Source: Statistical Abstract of Arunachal Pradesh 2023

 

District wise Biogas Plants, Solar, Chulla, Water Mill and Biomass Assessment Study in Arunachal Pradesh, 2020-21:

District

Solar Thermal

Biomass Gasifier

Water Mill

National Biogas & Manure Management Progm.

Wind Energy

National Programme on Improved Chullas

Wind Solar Hybrid Power Plant

Solar Water Heating System

PV Water Pumping system

Water Purifier

Biomass Gasifier

Biomass Assessment Study

Family type Biogas Plants

Night Soil based Biogas Plant

Assessment Study of Wind Energy

Improved Chullah

High Altitude Chullahs

LPDNo.No.No.No.No.No.No.No.No.No.No.Capacity in kWp
Tawang500---1-53-11325100--
West Kameng100---110190-3589699213.6
East Kameng100--12-1221-1540---
Pakke kessang-------------
Papum Pare170002121-7564-1625---
Kra Daadi-------------
Kurung Ku*mey------54--50---
Lower Subansiri300-----119--1739---
Kamle-------------
Upper Subansiri1100-2-2-80111860---
West Siang220013--2-395134233---
Si-Yomi500-----------60
Lepa Rada800------------
Siang700------------
Lower Siang500------------
East Siang10001-41-349--1665---
Upper Siang500--12-23--64520--
L.D. Valley20002----159--50---
Dibang Valley1000--11-8--162620--
Namsai900--+--10------
Lohit1500--41-303--308026110
Anjaw500-----26--150---
Changlang1200---1-2431-1470---
Tirap4001--1-121-1540---
Longding200------------
Total for A.P.3300019313161029029828494265383.6

Source: Statistical Abstract of Arunachal Pradesh 2021