Figure at a Glance in Assam, 2022-23:
Installed Capacity and Generation of Electricity in Assam, 2020-21 to 2022-23:
Requirement and shortage of Electricity in Assam, 2020-21 to 2022-23:
Transmission, Distribution and Commercial Losses in Assam, 2020-21 to 2022-23:
Electricity Purchased in Assam, 2020-21 to 2022-23:
Sector-Wise Electricity Consumption in Assam, 2021-21 to 2022-23: (Units in MU)
Circle-Wise number of Consumers in Assam, 2020-21 to 2022-23:
Source-wise Electricity in Assam Generated by APGCL, 2020-21 to 2022-23:
Voltage Level-Wise Existing Transmission Lines, 2019-20 to 2022-23:
Renewable Energy Related District-Wise Physical Performance of Agriculture Department in Assam, 2021-22 to 2022-23:
Renewable Energy Related District-Wise Physical Performance of Irrigation Department in Assam, 2021-22 to 2022-23:
Status of Electrification under DDUGJY-New Scheme : (FY 2021-22 to 2022-23)
Financial Status under DDUGJY-RE(XII Plan), DDUGJY, SAUBHAGYA and DDUGJY-New(Addl. HH) Scheme, 2020-21 to 2022-23: (Rs. in Crore)
Renewable Energy Physical Performance of APDCL during 2022-23:
District-wise 8MW Grid-Connected Rooftop SPV Plants in Assam during 2020-21:
District-wise Solar Street Light Projects under AEDA, 2019-20 and 2020-21:
District-wise Number of Villages Electrified in Assam, 2016-17 and 2017-18: